service companies, and controlling agencies. Effective energy utilization. View Specification PDF - The Pennsylvania Turnpike. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. Patch holes and penetrations in wood, masonry and plaster. Reference letters from minimum of three (3) registered professional engineers,
general contractors, building owners, explaining proficiency, quality of work,
or other attribute on projects of similar size or substance. 904 0 obj
<>stream
startxref
endstream
endobj
11262 0 obj
<>/Metadata 429 0 R/Outlines 455 0 R/PageLayout/OneColumn/Pages 11222 0 R/StructTreeRoot 1524 0 R/Type/Catalog>>
endobj
11263 0 obj
<>/Font<>>>/Rotate 0/StructParents 0/Type/Page>>
endobj
11264 0 obj
<>stream
Product data as specified in the electrical specifications unless otherwise noted:
Warranties and maintenance instructions shall be included in the O & M Manual only. If installers are not experienced in procedures, provide instruction by manufacturer's representatives. ph p h8 B* 0
0000001182 00000 n
These cookies will be stored in your browser only with your consent. Coordinate installation of large equipment requiring positioning prior to closing in the building. This instruction period shall consist of not less than five (5) eight (8) hour days. DTW Works Master Specification Section 16061- Grounding -Primary Issued 2005/06/01 PART 1 GENERAL 1.1 RELATED SECTIONS .1 Section 16010 - Electrical General Requirements. Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual. 878 0 obj
<>
endobj
Section 16010 - General Electrical Requirements . .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections .
264 0 obj <>
endobj
Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. "$u D2iH>`:\ &Ea 1.01 . GROUTING
Install nonmetallic nonshrink grout for electrical equipment base bearing surfaces and anchors. IBC (International Building Code). 1.08 TESTING A. 0000002809 00000 n
Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. NECA Standards of Installation
DELIVERY, STORAGE, AND HANDLING
Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. Refer to contract drawings where access panels have been specifically located. GUARANTEE/WARRANTY:
All materials, equipment, etc. 0000002587 00000 n
ajF-PsWMmR6i?G 0
Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. unless otherwise noted. Deep groove ball bearing. 6glqqS6&2S0gW BICSI and NICET certification, where required by these specifications. Install all components and equipment per manufacturers written instructions. Shutdown. Single strip, continuous, flexible interlocked, double-wrapped steel, galvanized inside andoutside, forming smooth internal wiring channel. {s@_yj1' 3{J1tB;=6bcC. If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. SITE VISIT
Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. 16010. .2 Section 01810 -Commissioning. Shop drawings detailing fabrication and installation requirements for electrical equipment. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. Also include the address, phone number and contact person for each supplier. This category only includes cookies that ensures basic functionalities and security features of the website. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. Install identifying devices prior to installing acoustical ceilings and similar concealment. endstream
endobj
startxref
mHs00\%Q` END OF SECTION 260000
University of Maryland, Baltimore
Bressler Research Building Seventh Floor Renovation Project No. Provide at least forty (40) hours straight time instruction to the operating personnel. In addition to the requirements specified in Division 01, indicate the following installed conditions:
Conduit and wire runs between the points
Equipment locations (exposed and concealed), dimensioned from prominent building lines. endstream
endobj
startxref
Remove conduit, hangers, supports, etc. These cookies do not store any personal information. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. PART 3 EXECUTION
ROUGHIN
Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. SECTION 16010 ELECTRICAL GENERAL PROVISIONS SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. Show all access doors for concealed junction boxes devices. All electrical outages which will interfere with the normal use of the building in any manner shall be done at such times as shall be mutually agreed upon by the contractor and the Office of Facilities Management. OSHA (Occupational Safety & Health Act). Environmental Sustainability 301 and Section 16010 of these Specifications. Available, on site, at all times during construction. EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS
The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. This Section of the Specifications and its accompanying Drawings are made product data and shall indicate applicable specification section and item numbers. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load . Only one submission per System Integrator will be allowed. The work descried hereunder shall be installed subject to the Contractual Conditions for the entire Specifications. 16010 - 1 . Packaging: Premixed and factorypackaged. Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. @ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* 0000001392 00000 n
Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following:
Indicate the proposed locations of electrical equipment, and materials. 0000005420 00000 n
Related Specification Sections include, but are not limited to, the following: 1. Submit the work permit with the outage request. Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. 3. Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. SUBMITTALS
General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". Provide service and operating manuals for the following:
Division 28 Section Digital, Addressable Fire Alarm System. Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. Upon written instructions from UMB, uncover and restore Work to provide for UMB observation of concealed Work. The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. %PDF-1.5
%
4206 0 obj
<>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream
State of Maryland Fire Prevention Code. B. B. Emergency operations. Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. 11282 0 obj
<>stream
8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS
Latest Update 03-10-2022. APPROVED EQUAL EQUIPMENT LAYOUTS
Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. The work to be done under this Division of the Specifications consists of the h. . Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. 2.0 GENERAL DESCRIPTION: A. COORDINATION DRAWINGS
General: When required participate in the preparation of the coordinated drawing effort for the project. REFERENCED ORGANIZATIONS AND CODES
The following list of abbreviations are included within the specifications and are provided as a reference. hb```,lleaX 0p7Q;0"cuLfJ
'f`^a]Qp@q
2pJHHX)3DX8\n*p. ZPwPEgjZv]QO^pV0VUE:/(@HaW#Zld$Wvm#*.fvRT!y>.eu
NzL2,:JiXQ4A76r,go$r:E)&UnW /L_CB!wmS9w*y*e@cOyWKm\-"/$JRX ?wPY/p IL?nL"a n[. Verify all dimensions by field measurements. left on top of ceilings and ceiling tiles. Maintenance agreements and similar continuing commitments. P}a
WNd|2Svk=vq!xKv!`,8h@
` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY Deliver on the premises, where directed, existing material and equipment which is to be salvaged and remain property of Owner. Copy of Maryland Master Electrician's License. endobj
Servicing. containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. Place markers in corner of tile. Deliver all certificates to the Owner prior to final acceptance of work. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. &%`T$cf:A5H(3Jy?'- ]
Cutting, welding and burning
Concrete housekeeping pads
Grouting
Protection of work
Provisions for access
Demonstration and instruction
Equipment provided under another division or by others
Record drawings
Closeout procedures
Inspections
Demolition
Repairs and restoration of surfaces and finishes
Final cleaning
Project punchout
Summary of Work:
Provide a complete integrated electrical system in accordance with the intent of
these specifications and the accompanying drawings. PART 1 GENERAL
RELATED DOCUMENTS
Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. The mark-ups shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. ["R2VhL"F{V>,r&!#NLefBRD49e6D0u4$KyL
!dU00BR0Cv1 n ~F
~ Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. CONCRETE HOUSEKEEPING PADS
COORDINATE CONCRETE WORK WITH DIVISION 3. C. PART 1 - GENERAL . Motor manufacturer, motor type or model . endstream
endobj
1821 0 obj
<>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>>
endobj
1822 0 obj
<>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>>
endobj
1823 0 obj
<>stream
If you want to know more or to change your cookie settings on your computer or device, please see our cookie policy. Job No. They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Schedule the preliminary and rough-in inspections in a timely manner. afdb`dg4baTfX:r-X5)H! Install equipment and materials in existing structures. Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. Outages should be scheduled a minimum of ten (10) days in advance. It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. o
It is the responsibility of the Contractor and its subcontractors to review all sections and ensure a complete and coordinated project.